                                    November 2006
                                    to September 2007 - 48m x 330m FACTORY FOR GULF PACKAGING INDUSTRIES LTD., Jubail, Saudi ArabiaClient: MADA Company
                                    for Industrial and Commercial Investment
 Consultant: Saudi Consulting and Design Office
 Participation: Preparation
                                    of reinforcement drawings and bar bending schedules for 900 tons of steel reinforcement for various foundation works - footings,
                                    pedestals, ground beams, columns, beams, slabs & machine foundations.
August 2006 to March 2007 - YANBU CEMENT
                                    FACTORY EXTENSION KILN 1 & 2, Yanbu, Saudi ArabiaClient:
                                    Yanbu Cement Factory / BHA Group GmbH
 Participation: Design of foundation for silo and stair tower structure, bag filter
                                    structure, cable bridges, substation building, fan motor and ducts supports; Design of steel structures for cable bridges
                                    and supports; Design of substation building; Supervision of draftsmen in preparing shop drawings; Preparation of quantity
                                    take-off and order of steel materials for the fabrication; Preparation of bar bending schedules & order of reinforcement.
April 2006 to March 2007- KHAYYAT NEW JEDDAH RED BRICKS FACTORY, Khulais,
                                    Saudi ArabiaClient: El Khayyat Red Bricks Co.
 Participation: Design of various foundations for Crusher Plant including
                                    Sieve Structure, Load Hopper Structure, Stair Tower and other steel structures; Preparation of shop drawings
                                    for above-described structures, platforms and ducting works; Preparation of material lists & quantity take-offs
                                    for ordering of raw materials & invoicing purposes; Preparation of bar bending schedules and order of steel reinforcement.
February 2006 to September
                                    2006 - NON-WOVEN FACTORY, Jubail, Saudi ArabiaClient: MADA
 Participation: Checking of design drawings
                                    and preparation of all shop drawings for issuance to site; Preparation of bar bending schedules and order of reinforcement
                                    for foundation works, retaining walls, silo foundation, concrete columns, suspended slabs and beams, stairs, ramps and equipment
                                    foundations; Preparation of fabrication drawings of all embedded items like anchor bolts, protection angles, base channels,
                                    gratings, manhole covers etc.
May 2005 to November 2005 - MPC PAMPERS FACTORY LINE 15
                                    EXTENSION WORKS, Jeddah, Saudi ArabiaClient: Modern Products Co. (Procter & Gamble)
 Participation: Preparation
                                    of all shop drawings for FAS Building & Production Building including PAROC wall, conveyor platforms, pipe racks,
                                    jib cranes, catwalks, process pipe supports, ladders, bollards and other steel fabrication works; Design for the strengthening
                                    and modification of existing structure to accomodate new line 16 structures; and Quantity take off and order of materials.
January 2005 to June 2005 - YANBU CEMENT FACTORY EXTENSION (KILN FEED NO.3),
                                    Yanbu, Saudi ArabiaClient: BHA GROUP GmbH
 Participation: Design of foundation for Stair Tower and Silo Structure,
                                    Bag Filter Structure, Cable Bridges, Substation Building, Fan Motor & Duct Supports; Design of steel structures for Cable
                                    Bridges and Supports; and Preparation of Quantity Take-off and Order of steel materials for the fabrication of Stair Tower,
                                    Bag Filter Structure, Cable Bridges, Substation Building and Duct Supports.
February 2004 to April 2004 - NFIC EXTENSION WORKS, Jeddah, Saudi ArabiaClient:
                                    National Food Industries Co.
 Participation: Design and engineering works for new hangar 30m x 7m, order of materials, preparation
                                    of bar bending schedule and site coordination.
February 2004 - NATEL OFFICE & WAREHOUSE EXTENSION, Jeddah, Saudi ArabiaClient:
                                    National Telecommunications Co. Ltd.
 Participation: Design of structural steel and foundation for Office and Warehouse
                                    Extension.
October
                                    2003 to November 2003 - ARABIAN CEMENT FACTORY, Rabigh, Saudi ArabiaClient: KHD Humboldt Wedag AG
 Participation:
                                    Site supervision for Silo Roof Reconstruction and Strengthening Works at Clinker Silo 5, Cement Silos 6, 7 & 8 and Raw
                                    Mill Silos 7 & 8.
May 2003 to December 2003 - ENTERPRISE PROJECT - MPC/88, Jeddah, Saudi ArabiaClient:
                                    Modern Products Co. (Procter & Gamble)
 Participation: Detailed engineering for Workshop & Training Center.
October 2002 to November 2003 - RED BRICKS FACTORY NO.10, Jizan, Saudi
                                    ArabiaClient: El-Khayyat Red Bricks Mfg. Co.
 Participation: Design and engineering for the fabrication of
                                    Factory Shed 233m x 38m x 12m high and numerous platforms; Preparation of bar bending schedule and order of materials
                                    for foundation works.
June 2002 to March 2003 - SAUDI CARTON FACTORY/ UNITED CARTON IND.
                                    CO., Jeddah, Saudi ArabiaClient: Omar Kaseem Alesayi Marketing Co.
 Participation: Design and engineering for
                                    the fabrication of structural steel for bridge connecting two buildings, 40m high advertisement tower, steel platforms and
                                    other structures.
June 2002 to January 21, 2003 - EL-KHAYYAT RED BRICKS FACTORY, Bahrah,
                                    Saudi ArabiaClient: El-Khayyat Red Bricks Mfg. Co.
 Participation: Design and engineering for the fabrication
                                    of structural steel for sheds, supports, platforms, ducts, thermal rooms and other structures.
May 2002 - BULGHAH GOLD MINE PROJECT, Bulghah, Saudi ArabiaClient:
                                    GCC Olayan
 Participation: Design of Transformer Foundation.
May 2002 - ARABIAN CEMENT FACTORY, Rabigh, Saudi ArabiaClient:
                                    Arabian Cement Co.
 Participation: Design of Roller Support for 65-ton gearbox.
September to October 2001 - CRISTAL PIGMENT PLANT, Yanbu, Saudi ArabiaClient:
                                    Cristal Co. Ltd.
 Participation: Detailed engineering and fabrication of Pressure Filter Building.
June 2001 - YANBU CEMENT FACTORY, Yanbu, Saudi ArabiaClient:
                                    KHD
 Participation: Design of steel pipe supports including foundation.
May 2001
                                    - GULF STATIONERY FOR FILE MFG., Industrial City, Jeddah, Saudi ArabiaClient: Gulf Packaging System Co.
 Participation:
                                    Design of factory 80m x 39m.
April 2001 - MATTEX FACTORY, Industrial City, Jeddah, Saudi ArabiaClient:
                                    Saudi Co. for Carpet Materials
 Participation: Design of steel pipe supports, stairs, loading platform and septic tank.
February to October 2001 - ENTERPRISE PROJECT - MPC/88, Jeddah, Saudi ArabiaClient:
                                    Modern Products Co.
 Participation: Detailed engineering for the fabrication and erection of structural steel for engineering
                                    workshop, production building, facility building, warehouse link building, production link building and parking shed.
October 2000 - SAUDI CRYSTAL BUILDING, Yanbu, Saudi ArabiaClient:
                                    Saudi Crystal
 Participation: Design of four-storey steel building.
August 2000 - CARPET FACTORY PLANT 1, Industrial City, Jeddah, Saudi ArabiaClient:
                                    Sh. Sorayai
 Participation: Detailed design of Mezzanine Floor, 44m x 22.5m x 3.8m high.
July 2000
                                    - MEDICAL PVC FACTORY, Industrial City, Jeddah, Saudi ArabiaClient: TIB Plastic Industries
 Participation:
                                    Detailed design of V-shaped car shed, 6m wide x 40m long, with 180x8 sq.tube rafter and 5"sch.40 pipe supports.
June to July 2000 - CARPET FACTORY PLANT 1, Industrial City, Jeddah, Saudi
                                    ArabiaClient: Sheik Sorayai
 Participation: Design of 3 heavy steel frames to replace 18 existing columns interfering
                                    with new equipment layout. These frames support 9 rafters spanning 45m. Affected area is 45m x 65m.
May 2000 - AGM PLASTIC FACTORY, Industrial City, Jeddah, KSAClient:
                                    AGM
 Participation: Design of 540sqm additional office area over an existing roof. New columns and beams are provided to
                                    carry the loads.
December 1999 to May 2001- SAUDI MODERN FOOD FACTORY, Industrial City, Jeddah,
                                    KSAClient: Basamah Trading
 Participation: Design of foundation for 5000sqm factory, two-storey 450sqm office
                                    building, 576sqm mezzanine floor, pump rooms for firefighting and potable water, and underground tanks for firefighting water,
                                    potable water, untreated raw water, treated raw water and returned water.
September 1999 - YANBU CEMENT FACTORY, Yanbu, Saudi ArabiaClient:
                                    KHD-Yanbu Cement Factory
 Participation: Detailed design of Tripper Car Docking Tower, 4.2m x 6m x 17m high.
October to December 1998 - CARPET FACTORY PLANT 1, Industrial City, Jeddah,
                                    Saudi ArabiaClient: Sheik Sorayai
 Participation: Design of heavy steel frame to replace existing columns interfering
                                    with new equipment layout.
July to December 1998 - ATTIEH STEEL FACTORY, Jeddah, Saudi ArabiaClient:
                                    Arabian International Co.
 Participation: Design of shearing machine foundation, chimney foundation and septic tanks.
July 1998
                                    - AL-TAYAR PLASTIC & RUBBER FACTORY, Jeddah, Saudi ArabiaClient: Gulf Co. for Packaging Systems
 Participation:
                                    Design of Building Shed for silos 4.5m wide x 45m long x 8.7m high.
June to
                                    July 1998 - AL-SALAMA HOSPITAL, Jeddah, Saudi ArabiaClient: Saudi Bauer
 Participation: Order of materials,
                                    fabrication and delivery of reinforcement for concrete piles of various sizes - dia.450x8m to 12m.
January to July 1998 - CARPET FACTORY PLANT 2 EXTENSION, Industrial City,
                                    Jeddah, KSAClient: Sheik Sorayai
 Participation: Design of foundation and structure for 8 silos, and machine
                                    platform structure, 60 tons total weight.
January to March 1998 - SAUDI MODERN FOOD FACTORY, Industrial City, Jeddah,
                                    KSAClient: Basamah Trading
 Participation: Design of maintenance platform at Boiler Room, platform for pump
                                    and gas tanks, cantilever maintenance platform at silo area and chimney pipes.
December 1997 - FILM BLOWING LINE TOWER, Industrial City, Jeddah, Saudi ArabiaClient:
                                    Al-Tayar Plastic & Rubber Factory
 Participation: Design, fabrication and erection.
November 1997 - LOADING DOCK FOR CARPET FACTORY, Industrial City, Jeddah,
                                    Saudi ArabiaClient: Sorayai Carpet Factory
 Participation: Design of loading dock between Plants 1 & 3.
                                    Precast cantilever walls were used to avoid interference with the plant operation.
October 1997 - ATTIEH STEEL FACTORY, Bahrah, Saudi ArabiaClient:
                                    Arabian International Co.
 Participation: Design of various machine foundations and underground tanks.
September 1997 - STEEL VEHICLE RAMP, AAA, Jeddah, Saudi ArabiaClient:
                                    Arabian Auto Agency
 Participation: Structural design of steel modular ramp, 17m long x 6m wide and 1.8m high.
November 1996 - AL-TAYAR PLASTIC FACTORY, Industrial City, Jeddah, Saudi
                                    ArabiaClient: Al-Tayar Plastic Manufacturing Co.
 Participation: Structural design of Cantilever Parking Shed.
December
                                    1995 to August 1997 - SUGAR REFINERY PROJECT, Jeddah, Saudi ArabiaClient: TPL Arabia Ltd.
 Participation: Overall
                                    Project Engineer. Detailed design and supervision for the preparation of shop drawings, submittals, fabrication, erection
                                    and site works for  steel conveyors, towers, supports, bridges, pipe racks, shelters,
                                    handrails, ladders, stairs, gratings, catwalks and other miscellaneous structures.
August 1995 to January 1998- SAUDI GLASS FACTORY, Industrial City, Jeddah,
                                    Saudi ArabiaClient: Saudi Glass Co.
 Participation: Design of structures including Switchgear Room supported
                                    by one row of columns, cantilever floor beams and strip footings, Watchman Tower, Retaining Wall for wet sand, Machine Platforms,
                                    Factory Extension and miscellaneous structures.
October to November 1994 - REFRIGERATED PLANT, WAREHOUSE, OFFICE & ACCOMODATION
                                    BLDG, Halaga, Jeddah, Saudi ArabiaClient: Al-Ghamdi
 Participation: Structural design of foundation and structures.
August 1994 - YANBU CEMENT FACTORY, Yanbu, Saudi ArabiaClient:
                                    KHD - Yanbu Cement Factory
 Participation: Structural design and coordination for the order, fabrication and delivery of
                                    materials for cantilever carport and butterfly carport.
July 1994 - GSM OVERLAY NETWORK, Jeddah, Saudi ArabiaClient:
                                    Siemens
 Participation: Structural design of various steel substructures for antennae.
February
                                    1994 - SAUDI MODERN FOOD FACTORY, Industrial City, Jeddah, Saudi ArabiaClient: Saudi Modern Food Factory
 Participation:
                                    Structural design, preparation of fabrication drawings, order of materials and overall coordination for Two-Level Maintenance
                                    Platform.
January to November 1994 - SORAYAI CARPET FACTORY - HARAJ, Jeddah, Saudi
                                    ArabiaClient: Sheik Sorayai
 Participation: Structural design, preparation of fabrication drawings, order of
                                    materials and overall coordination for the construction of 1 Warehouse with Mezzanine Floor (44mx72mx9m high) and 1 Two-Storey
                                    Showroom (20mx30mx8m high).
November 1993 - AGM FACTORY, Industrial City, Jeddah, Saudi ArabiaClient:
                                    AGM Factory
 Participation: Structural design of Additional Room Inside Factory.
October 1993 - SAUDI MODERN FOOD FACTORY, Industrial City, Jeddah, Saudi
                                    ArabiaClient: Saudi Modern Food Factory
 Participation: Structural design of Maintenance Platform around silos.
June 1993
                                    - RABIGH MINING FACTORY, Rabigh, Saudi ArabiaClient: Rabigh Mining Factory
 Participation: Structural design
                                    of foundation for various machineries and equipments.
September 1991 - RUBBER FACTORY WAREHOUSE, Gaya-Gaya, San Jose del Monte,
                                    Bulacan, PhilippinesClient: Mr. & Mrs. Kameo Nakano
 Participation: Complete design, drafting, estimate
                                    and supervision.
April 1991 - BUILDING FOR RUBBER FACTORY, Sta. Maria, Bulacan,
                                    PhilippinesClient: Mr. & Mrs. Kameo Nakano
 Participation: Complete design, drafting and estimate.
December 1990 - STEEL WAREHOUSE, Bagbag,
                                    Novaliches, Quezon City, PhilippinesClient: Mr. & Mrs. Kameo Nakano
 Participation: Complete design, drafting
                                    and estimate.
 
 
 |  
                              |  |  
                              |  |  
                              |  |  
                              |  |  
                              |  |  
                              |  |  |  
                     | 
                           