  • October 2007 to Present - BARWA CITY PROJECT (QR4.9B), Doha, Qatar
    Client: Barwa Real Estate Investment Co.
    Consultant: Maunsell Consultancy Services
    Position: Senior Structural Engineer
    Contractor: Bilfinger Berger
    Project Description: Project consists of 128 buildings, 2-storey to 7-storey, all precast except foundation.
  • October 2003 to September 2004 - CORAL REEF ENCOUNTER, North Obhur, Jeddah, Saudi Arabia
    Client: Issham International Co.
    Participation: Design of all structures for jetties, walkways, gazebos, retaining walls, floating gardens, underwater viewing chamber and other structures. Footings, columns and deck formworks are all precast. Deck slabs are cast-in-place.
  • March 2003 to June 2003 - AL-ULA SUBSTATION, Al-Ula, Saudi Arabia
    Client: ABB Contracting Co.
    Participation: Design of precast boundary wall 2.55m high x 460m long; Preparation of bar bending schedules and order of materials for buildings, ducts, underground water tanks, oil separation tanks, transformer foundations, gantry foundations, pump room, control room and other civil structures.
  • January 2003 to April 2003 - 110/13.8KV YANBU NORTH SUBSTATION, Yanbu, Saudi Arabia
    Client: ABB Contracting Co.
    Participation: Design of precast boundary wall 2.8m high x 160m long; Preparation of bar bending schedules and order of materials for buildings, ducts and other civil structures.
  •  April to July 2002 - SUDEIRY BEACH HOUSE, North Obhur, Jeddah, Saudi Arabia
    Client: Sheik Zeid Sudeiry
    Participation: Design of precast support for gazebo, pump room, tank farm and dolphin sculpture.
  •  April 2001 - AAA BEACH HOUSE, North Obhur, Jeddah, Saudi Arabia
    Client: Zeem Corporation
    Participation: Design of precast column and foundation for Thai Hut Lounge.
  • March 2001 - AL-MOEYAH SUBSTATION, Moeyah, Saudi Arabia
    Client: Saudi Electric Co.
    Participation: Design of boundary wall 2.6m high x 400m long, all precast.
  • January 2001 - BEACH HOUSE COTTAGE, North Obhur, Jeddah, Saudi Arabia
    Client: Zeem Corporation
    Participation: Design of concrete support structures for wooden beach house cottage and walkways.
  • September 2000 - MINA DEVELOPMENT PROJECT, Mina, Saudi Arabia
    Client: Al-Owaidah Contracting Co.
    Participation: Design of all-precast boundary wall 4m high x 3000m long.
  • November 1999 to August 2000- SUDEIRY BEACH HOUSE, North Obhur, Jeddah, KSA
    Client: Sheik Zeid Sudeiry
    Participation: Design of warehouse and workshop, boundary wall, precast walkway, and precast blocks for artificial island.
  • November 1999 - MINA DEVELOPMENT PROJECT, Mina, Saudi Arabia
    Client: Al-Owaidah Contracting Co.
    Participation: Design of substation boundary wall, 480m long x 2.6m high, all precast.
  • May to July 1999 - ARAFAT SUBSTATION EXTENSION, Makkah, Saudi Arabia
    Client: National Telecommunications
    Participation: Design of boundary wall 2.8m high, 100m long, all precast.
  • December 1998 - SUDEIRY BEACH HOUSE, North Obhur, Jeddah, Saudi Arabia
    Client: Sheik Zeid Sudeiry
    Participation: Design of boundary wall at sea south side using precast walls and columns, and cast-in-place footings.
  • August 1998 - S/S ISKAN AL AAM SUBSTATION, Madinah, Saudi Arabia
    Client: Al Aam Substation
    Participation: Design of boundary wall using precast footings, columns and wall panels. Height= 3m, Total length= 192m.
  • June to July 1998 - YACHT HARBOUR NEW LAND, North Obhur, Jeddah, Saudi Arabia
    Client: Zeem Corporation
    Participation: Design of 4m & 6m high dockwalls and gazebo; Precast hollow blocks 2mx1mx1m & 2mx1.4mx1m high are stacked over each other to obtain the required dock height. Total length of dockwall is 115m.
  • December 1997 - ALIREZA JETTY, North Obhur, Jeddah, Saudi Arabia
    Client: Sheik Alireza
    Participation: Design of wooden jetty supported by precast beam-column-footing spaced at 6m on center.
  •  November 1997 - LOADING DOCK FOR CARPET FACTORY, Industrial City, Jeddah, Saudi Arabia
    Client: Sorayai Carpet Factory
    Participation: Design of loading dock between Plants 1 & 3. Precast cantilever walls were used to avoid interference with the plant operation.
  • November 1997 - BOUNDARY WALL, North Obhur, Jeddah, Saudi Arabia
    Client: Al-Angari
    Participation: Design of 4.5m high boundary wall extending 70m towards the reef line. System is composed of precast footings, columns and walls.
  • September 1997 - MARINA WORKS, Manama, Bahrain
    Client: Fast Flow Services
    Participation: Structural design of slipway, pontoons and steel piles.
  • June 1997 - MARINA WORKS, Jeddah, Saudi Arabia
    Client: Sheik Zyad Qerbawi
    Participation: Structural design of precast jetty and gazebo.
  • October 1996 to September 1997 - NEW BOAT DOCK, North Obhur, Jeddah, Saudi Arabia
    Client: Zeem Corporation
    Participation: Structural design of New Dockwall 2m wide x 100m long x 7.6m deep, Seawater Pumphouse, Mezzanine Floor at Quarantine Building and Gazebo.
  • March 1996 - AL-OTHMAN MARINA WORKS, Jeddah, Saudi Arabia
    Client: Sheik Al-Othman
    Participation: Structural design of precast retaining walls to form an octagonal-shape sitting area and slipway.
  • August 1995 - ZAHID BEACH HOUSE, North Obhur, Jeddah, Saudi Arabia
    Client: Sheik Fahad Zahid
    Participation: Structural design of precast jetty and gazebo.
  • July 1995 to June 1996 - ALIREZA PRIVATE VILLA, Jeddah, Saudi Arabia
    Client: Sheik Nabil Alireza
    Participation: Structural design of Main Villa (A=2000 sqm) and Underground Tanks. Floor all hollow-core slabs.
  • July 1995 - THAI HOUSE, North Obhur, Jeddah, Saudi Arabia
    Client: Zeem Corporation
    Participation: Structural design of structural supports - precast concrete footings and columns on asbestos pipes.
  •  May to June 1995 - AL-KAMAL OFFICE BUILDING, Jeddah, Saudi Arabia
    Client: Al-Kamal Import Office Co. Ltd.
    Participation: Structural design of foundation for tower crane, and modification of structural systems like floor and precast concrete cladding.
  •  September 1994 - PRIVATE MARINA, North Obhur, Jeddah, Saudi Arabia
    Client: Sheik Fahad Zahid
    Participation: Structural design of precast concrete pedestals and footings to support a wooden jetty and gazebo, and precast blocks and slabs to form a slipway.
  • January to December1994 - JEDDAH TOURISTIC CITY, Dahban, Saudi Arabia
    Client: SAMACO
    Participation: Structural design of Precast Retaining Walls, Diaphragm Walls and Stone Screen Structure.
  • October 1993 - CAMP OFFICE BUILDING, Jeddah, Saudi Arabia
    Client: Azzam Trading & Contracting
    Participation: Structural design of office building, hollow-core slabs.
  • August to September 1993 - MARINA EXTENSION, North Obhur, Jeddah, Saudi Arabia
    Client: Zeem Corporation
    Participation: Structural design of dockwall 2m wide x 80m long. Type: Precast concrete hollow blocks 2mx1mx1mhigh stacked over each other in staggered position resting over precast concrete bases.
  • August 1993 - THREE-STOREY BUILDING, Bahrah, Saudi Arabia
    Client: Al-Tayar Old Plastic Factory
    Participation: Structural design of 3-storey building, all slabs hollow-core.


Mailing Address: P.O. Box 6650 Doha, Qatar