December 1995 to August 1997 - SUGAR
REFINERY PROJECT, Jeddah, Saudi Arabia Client: TPL Arabia Ltd. Consultant: Technipetrol Italy Participation: Detailed
design and supervision for the preparation of shop drawings, material lists and other submittals for approval of client and
consultant; Overall coordination for the fabrication, erection and site works including handling of sub-contractors. Scope
of work: Steel conveyors, towers, supports, bridges, pipe racks, shelters, handrails, ladders, stairs, gratings, catwalks
and other miscellaneous steel structures.
·
June 1998 to June 2000 - YANPET EXPANSION
PROJECT, Yanbu, Saudi Arabia Client: AMC Industrial Construction - Mitsubishi Heavy Industries Consultant: Fluor Daniel Participation:
Detailed design, overall coordination for preparation of shop drawings, fabrication and delivery to Yanbu site, of structural
steel composed of various platforms, pipe supports, davit supports, handrails, ladders, gratings, checkered plates, fencing
materials for substations and other steel structures.
·
April 1999 to July 2000 - 380KV GIS
BLDG EXT AND CABLE ROUTE TO CONTROL ROOM, Yanbu, Saudi Arabia Client: Mitsubishi Corporation Consultant: Royal Commission
for Jubail and Yanbu Participation: Design of cable route from 380KV GIS Building to Control Room composed of the following
structures: two(2) cable bridges 28m span, 2m wide, 2.6m deep, and 19m span, 2.5m wide, 2.6m deep; reinforced duct banks 300m
long; various manholes; cable trays; transformer building; septic tanks, catwalks, stairs, handrails, ladders and platforms.
·
February to October 2001 - ENTERPRISE
PROJECT - MPC/88, Jeddah, Saudi Arabia Client: Modern Products Co. (Procter & Gamble) Consultant: SAK Engineering
Consultants Participation: Detailed engineering for the fabrication and erection of structural steel for engineering workshop,
production building, facility building, warehouse link building, production link building and parking shed.
·
June 2002 to January 21, 2003 -
EL-KHAYYAT RED BRICKS FACTORY, Bahrah, Saudi Arabia Client: El-Khayyat Red Bricks Mfg. Co. Participation: Design and
engineering for the fabrication of structural steel for sheds, supports, platforms, ducts, thermal rooms and other structures.
·
October 2002 to November 2003 - RED
BRICKS FACTORY NO.10, Jizan, Saudi Arabia Client: El-Khayyat Red Bricks Mfg. Co. Participation: Design and engineering
for the fabrication of Factory Shed 233m x 38m x 12m high and numerous platforms; Preparation of bar bending schedule
and order of materials for foundation works.
·
October 2003 to September 2004 - CORAL REEF ENCOUNTER, North Obhur, Jeddah, KSA Client: Obhur Coral Reef Encounter Consultant: Issham International Co. Participation:
Design of all structures for jetties, walkways, gazebos, retaining walls, floating gardens, underwater viewing chamber and
other structures. Footings, columns and deck formworks are all precast. Deck slabs are cast-in-place.
·
May 2004 to September 2004 - AL HAKEEM
GIRLS' SCHOOL EXTENSION, Jeddah, Saudi Arabia Client: Dar Al Zikr / Syed Masood Ahmed Est. Participation: Design of
steel structures and foundation for the addition of one storey above existing building, preparation of engineering and shop
drawings, bar bending schedules, order of materials, fabrication coordination and supervision.
·
December 2004 to December 2005 - EXTENSION
OF SHOAIBAH 380KV SUBSTATION, Shoaibah, Saudi Arabia Client: Nichimen Corporation Consultant: Saudi Consulting Services Participation:
Preparation of all shop drawings for 380KV GIS Building, Control Building, Cable Rack Bridge, Equipment Foundations, Siporex
Materials and Interface Modification Works; Quantity take off and order of all structural steel materials for GIS Building,
Control Building, Cable Rack Bridge and various embedded items like protection angles, anchor bolts and base channels for
GIB support foundation, shunt reactor foundation, LA foundation, DS foundation etc.; and Preparation of bar bending
schedules and order of reinforcement for all concrete works including foundation, retaining wall, tunnels, slabs and oil separation
tank.
·
January 2005 to June 2005 - YANBU CEMENT
FACTORY EXTENSION (KILN FEED NO.3), Yanbu, Saudi Arabia Client: BHA GROUP GmbH Participation: Design of foundation for
Stair Tower and Silo Structure, Bag Filter Structure, Cable Bridges, Substation Building, Fan Motor & Duct Supports; Design
of steel structures for Cable Bridges and Supports; and Preparation of Quantity Take-off and Order of steel materials for
the fabrication of Stair Tower, Bag Filter Structure, Cable Bridges, Substation Building and Duct Supports.
·
May 2005 to November 2005 - MPC PAMPERS
FACTORY LINE 15 EXTENSION WORKS, Jeddah, Saudi Arabia Client: Modern Products Co. (Procter & Gamble) Consultant:
SAK Engineering Consultants Participation: Preparation of all shop drawings for FAS Building & Production Building
including PAROC wall, conveyor platforms, pipe racks, jib cranes, catwalks, process pipe supports, ladders, bollards and other
steel fabrication works; Design for the strengthening and modification of existing structure to accomodate new line 16 structures;
and Quantity take off and order of materials.
·
February 2006 to September 2006 - NON-WOVEN FACTORY,
Jubail, Saudi Arabia Client: MADA Consultant: Saudi Consulting and Design Office Participation: Checking of design
drawings and preparation of all shop drawings for issuance to site; Preparation of bar bending schedules and order of reinforcement
for foundation works, retaining walls, silo foundation, concrete columns, suspended slabs and beams, stairs, ramps and equipment
foundations; Preparation of fabrication drawings of all embedded items like anchor bolts, protection angles, base channels,
gratings, manhole covers etc.
·
April 2006 to March 2007- KHAYYAT NEW JEDDAH RED
BRICKS FACTORY, Khulais, Saudi Arabia Client: El Khayyat Red Bricks Co. Participation: Design of various foundations
for Crusher Plant including Sieve Structure, Load Hopper Structure, Stair Tower and other steel structures; Preparation
of shop drawings for above-described structures, platforms and ducting works; Preparation of material lists &
quantity take-offs for ordering of raw materials & invoicing purposes; Preparation of bar bending schedules and order
of steel reinforcement.
- August 2006 to March 2007 - YANBU CEMENT FACTORY EXTENSION KILN 1 & 2, Yanbu, Saudi Arabia
Client: Yanbu Cement Factory / BHA Group
GmbH Participation: Design of foundation for silo and stair tower structure, bag filter structure, cable bridges, substation
building, fan motor and ducts supports; Design of steel structures for cable bridges and supports; Design of substation building;
Supervision of draftsmen in preparing shop drawings; Preparation of quantity take-off and order of steel materials for the
fabrication; Preparation of bar bending schedules & order of reinforcement.
- November 2006 to September 2007 - 48m x 330m FACTORY FOR GULF PACKAGING
INDUSTRIES LTD., Jubail, Saudi Arabia
Client: MADA Company for Industrial and Commercial Investment Consultant: Saudi
Consulting and Design Office Participation: Preparation of reinforcement drawings and bar bending schedules for 900
tons of steel reinforcement for various foundation works - isolated footings, combined footings, mat foundations, machine
foundations, pedestals, columns, beams and slabs.
- November 2006 to September 2007 - RABIGH REFINING & PETROCHEMICAL
COMPANY, Rabigh, Saudi Arabia
Client: Sojitz Corp. (Japan AE Power Systems Corp.) Consultant: Foster Wheeler Energy
Limited Participation: Design of steel structures for 8 substations SS-30, SS-40, SS-44, SS-45, SS-46, SS-49, SS-60 &
SS-63; Supervision of draftsmen in preparing all shop drawings; Quantity take-off and order of steel materials; Preparation
of bar bending schedules & order of reinforcements; Organize quality control inspection & testing with third party
independent testing laboratory; Submittal of QC/QA documents for approval of consultant; Preparation of various engineering
reports.
- October 2007 to Present - BARWA CITY PROJECT (QR4.9B), Doha, Qatar
Client: Barwa Real Estate Investment Co. Consultant: Maunsell Consultancy Services Position:
Senior Structural Engineer Participation: Checking of shop drawings and calculations; Coordination of inspectors for quality
control and checking of site works; Checking of method statements and ITPs; Preparation of various engineering reports and
correspondence.
|