  • November 2006 to September 2007 - RABIGH REFINING & PETROCHEMICAL COMPANY, Rabigh, Saudi Arabia
    Client: Sojitz Corp. (Japan AE Power Systems Corp.)
    Consultant: Foster Wheeler Energy Limited
    Participation: Design of steel structures for substations SS-30, SS-40, SS-44, SS-45, SS-46, SS-49, SS-60 & SS-63; Supervision of draftsmen in preparing all shop drawings; Quantity take-off and order of steel materials; Preparation of bar bending schedules & order of reinforcements; Organize quality control inspection & testing with third party independent testing laboratory; Submittal of QC/QA documents for approval of consultant; Preparation of various engineering reports.
  • December 2004 to December 2005 - EXTENSION OF SHOAIBAH 380KV SUBSTATION, Shoaibah, Saudi Arabia
    Client: Nichimen Corporation
    Participation: Preparation of all shop drawings for 380KV GIS Building, Control Building, Cable Rack Bridge, Equipment Foundations, Siporex Materials and Interface Modification Works; Quantity take off and order of all structural steel materials for GIS Building, Control Building, Cable Rack Bridge and various embedded items like protection angles, anchor bolts and base channels for GIB support foundation, shunt reactor foundation, LA foundation, DS foundation etc.; and Preparation of bar bending schedules and order of reinforcement for all concrete works including foundation, retaining wall, tunnels, slabs and oil separation tank.
  • April 2004 to August 2004 - SHANABRAH & GARWA SUBSTATION EXTENSION, Taif, Saudi Arabia
    Client: National Electric Engineering Co. (Hitachi)
    Participation: Design and engineering for 40MVA Transformer Foundation, Oil Separation Tank and miscellaneous steel works.
  • April 2004 to August 2004 - MEDINA SOUTH & AIRPORT ROAD SUBSTATION EXTENSION, Medina, Saudi Arabia
    Client: National Electric Engineering Co. (Hitachi)
    Participation: Design and engineering for 40MVA Transformer Foundation, Duct Banks, Control Room and Oil Pit.
  • November 2003 to December 2003 - 110/33KV SHOAIBAH SUBSTATION EXTENSION, Shoaibah, Saudi Arabia
    Client: National Telecommunications Co. Ltd.
    Participation: Design of Switchgear Building, Transformer Foundations & Oil Separation Tanks.
  • June 2003 to September 2003 - TAIMA SUBSTATION, Taima, Saudi Arabia
    Client: ABB Contracting Co.
    Participation: Preparation of bar bending schedules and order of materials for buildings, ducts, underground water tanks, oil separation tanks, transformer foundations, gantry foundations, pump room, control room and other civil structures.
  • March 2003 to June 2003 - AL-ULA SUBSTATION, Al-Ula, Saudi Arabia
    Client: ABB Contracting Co.
    Participation: Design of precast boundary wall 2.55m high x 460m long; Preparation of bar bending schedules and order of materials for buildings, ducts, underground water tanks, oil separation tanks, transformer foundations, gantry foundations, pump room, control room and other civil structures.
  • January 2003 to April 2003 - 110/13.8KV YANBU NORTH SUBSTATION, Yanbu, Saudi Arabia
    Client: ABB Contracting Co.
    Participation: Design of precast boundary wall 2.8m high x 160m long; Preparation of bar bending schedules and order of materials for buildings, ducts and other civil structures.
  • December 2002 to September 2003 - 110/33/13.8KV UMLUJJ SUB-STATION, Umlujj, Saudi Arabia
    Client: ABB Contracting Co.
    Participation: Preparation of bar bending schedules and order of materials for buildings, ducts and other civil structures.
  • January 2001 - AL-JAMIA SUBSTATION, Jeddah, Saudi Arabia
    Client: Hitachi Ltd.
    Participation: Design of steel structures to support lightning arresters, line traps, station post insulators and coupling capacitors.
  • September 2000 - SHOHAIBAH POWER PLANT, Shohaibah, Saudi Arabia
    Client: Hitachi Ltd.
    Participation: Design of miscellaneous steel supports.
  • March 2000- SHOHAIBAH POWER PLANT, Shohaibah, Saudi Arabia
    Client: Shohaibah Power Plant
    Participation: Design of steel structures for generator house and sewage treatment plant.
  • May to July 1999 - ARAFAT SUBSTATION EXTENSION, Makkah, Saudi Arabia
    Client: National Telecommunications
    Participation: Design of steel building and boundary wall 2.8m high, 100m long, all precast.
  • April 1999 to July 2000 - 380KV GIS BLDG EXT AND CABLE ROUTE TO CONTROL ROOM, Yanbu, Saudi Arabia
    Client: Mitsubishi Corporation
    Participation: Design of cable route from 380KV GIS Building to Control Room composed of the following structures: two(2) cable bridges 28m span, 2m wide, 2.6m deep, and 19m span, 2.5m wide, 2.6m deep; reinforced duct banks 300m long; various manholes; cable trays; transformer building; septic tanks, catwalks, stairs, handrails, ladders and platforms.
  • October 1998 - RABIGH EXCHANGE EXTENSION, Rabigh, Saudi Arabia
    Client: Saudi Wiemer & Trachte Ltd.
    Participation: Design, preparation of fabrication drawings and overall coordination for the fabrication and delivery of steel materials.
  • June 1998 to June 2000 - YANPET EXPANSION PROJECT, Yanbu, Saudi Arabia
    Client: AMC Industrial Construction - Mitsubishi Heavy Industries
    Participation: Detailed design, overall coordination for preparation of shop drawings, fabrication and delivery to Yanbu site, of structural steel composed of various platforms, pipe supports, davit supports, handrails, ladders, gratings, checkered plates, fencing materials for substations and other steel structures.
  • May 1998 - TARUT EXCHANGE EXTENSION, Dammam, Saudi Arabia
    Client: Saudi Wiemer & Trachte Ltd.
    Participation: Design, preparation of fabrication drawings and overall coordination for the fabrication and delivery of steel materials.
  • September to November 1997 - AL-BAHA EXCHANGE EXTENSION, Al-Baha, Saudi Arabia
    Client: Saudi Wiemer & Trachte Ltd.
    Participation: Design, preparation of fabrication drawings and overall coordination for the order, fabrication and delivery of steel materials.
  • December 1995 to August 1997 - SUGAR REFINERY PROJECT, Jeddah, Saudi Arabia
    Client: TPL Arabia Ltd.
    Participation: Overall Project Engineer. Detailed design and supervision for the preparation of shop drawings, submittals, fabrication, erection and site works for  steel conveyors, towers, supports, bridges, pipe racks, shelters, handrails, ladders, stairs, gratings, catwalks and other miscellaneous structures.