August 1989 - THREE-STOREY RESIDENTIAL
BUILDING, Richgate, Baguio City, Phils.
Client: Mr. Martin C. Balot
Participation: Complete design and drafting of three-storey
building on a sloping ground.
·
February 1990 - THREE-STOREY BUILDING,
Maypajo, Caloocan City, Philippines
Client: Engr. German Polintan
Participation: Complete structural design.
·
March 1990 - APD HOUSING PROJECT, Fairview,
Quezon City, Philippines
Client: Quezon City Government
Participation: Design of rowhouse residential building.
·
June 1990 - TWO-STOREY RESIDENCE, Bagbag,
Novaliches, Quezon City, Philippines
Client: Mr. & Mrs. Kameo Nakano
Participation: Complete design, drafting and
estimate.
·
October 1990 - FIVE-STOREY BUILDING
UNITS, Sta. Mesa Heights, Quezon City, Phils.
Client: Quezon City Government
Participation: Structural design.
·
December 1990 - STEEL WAREHOUSE, Bagbag,
Novaliches, Quezon City, Philippines
Client: Mr. & Mrs. Kameo Nakano
Participation: Complete design, drafting and
estimate.
·
April 1991 - BUILDING FOR RUBBER FACTORY,
Sta. Maria, Bulacan, Philippines
Client: Mr. & Mrs. Kameo Nakano
Participation: Complete design, drafting and estimate.
·
May 1991 - FIVE-STOREY COMMERCIAL BUILDING,
Quezon City, Philippines
Client: Engr. Raymundo Itliong
Participation: Structural design.
·
May 1991 - TWO-BEDROOM RESIDENCE, Valley
View, Cainta, Rizal, Philippines
Client: Mr. & Mrs. Federico Jablo
Participation: Complete design, drafting and
estimate.
·
June 1991 - THREE-BEDROOM RESIDENCE,
Fil-invest II, Quezon City, Philippines
Client: Mr. & Mrs. Antonio Nebran
Participation: Complete design, drafting
and estimate.
·
August 1991 - THREE-STOREY RESIDENTIAL
BUILDING, Marilao, Bulacan, Philippines
Client: Mr. Mario Tuason
Participation: Structural design and drafting.
·
September 1991 - RUBBER FACTORY WAREHOUSE,
Gaya-Gaya, San Jose del Monte, Bulacan, Philippines
Client: Mr. & Mrs. Kameo Nakano
Participation: Complete design,
drafting, estimate and supervision.
·
December 1991 - THREE-BEDROOM RESIDENCE,
Greenview Royale, Quezon City, Philippines
Client: Ms. Thelma Paeste Ramos
Participation: Complete design, drafting
and estimate.
·
January 1992 - RESIDENTIAL & COMMERCIAL
COMPLEX, Project 8, Quezon City, Philippines
Client: Angelina S. Pangilinan
Participation: Complete design, drafting
and estimate.
·
April 1992 - TWO-STOREY EXTENSION BUILDING,
Talon, Las Pinas, Philippines
Client: Lt. Hugo Oaferina
Participation: Complete design, drafting and estimate.
·
June 1992 - TWO-STOREY RESIDENTIAL BUILDING,
Greenland, Nangka, Marikina, Philippines
Client: Mr. & Mrs. Salvador Venzuela
Participation: Complete design, drafting
and estimate.
·
November 1992 - ADDITION OF SECOND FLOOR,
La Mesa Homesite, Fairview, Quezon City, Philippines
Client: Mrs. Simpatica Mendoza
Participation: Complete design,
drafting and estimate.
·
May 1993 - EXTENSION OF GENERATOR BUILDING,
Jeddah, Saudi Arabia
Client: Azzam Trading & Contracting
Participation: Structural design.
·
June 1993 - STEEL CRADLE FOR 70-TON
YACHT, Jeddah, Saudi Arabia
Client: Sheik Zeid Sudeiry
Participation: Structural design, drafting and detailing.
·
June 1993 - RABIGH MINING FACTORY, Rabigh,
Saudi Arabia
Client: Rabigh Mining Factory
Participation: Structural design of foundation for various machineries and
equipments.
·
June to July 1993 - AMMUNITION BUNKERS,
FIRING CONTROL UNITS AND ANTI-AIRCRAFT CONCRETE PADS, Hafr Al-Batin, Saudi Arabia
Client: King Khalid Military City
Consultant:
Ballast Nedam Groep
Participation: Structural design.
·
August 1993 - TWO-STOREY SQUASH COURT,
Jeddah, Saudi Arabia
Client: Engr. Kindi
Participation: Structural design.
·
August 1993 - THREE-STOREY BUILDING,
Bahrah, Saudi Arabia
Client: Al-Tayar Old Plastic Factory
Participation: Structural design.
·
August to September 1993 - MARINA EXTENSION,
North Obhur, Jeddah, Saudi Arabia
Client: Zeem Corporation
Participation: Structural design of dockwall 2m wide x 80m
long. Type: Precast concrete hollow blocks 2mx1mx1mhigh stacked over each other in staggered position resting over precast
concrete bases.
·
October 1993 - SAUDI MODERN FOOD FACTORY,
Industrial City, Jeddah, Saudi Arabia
Client: Saudi Modern Food Factory
Participation: Structural design of Maintenance
Platform around silos.
·
October 1993 - CAMP OFFICE BUILDING,
Jeddah, Saudi Arabia
Client: Azzam Trading & Contracting
Participation: Structural design.
·
November 1993 - AGM FACTORY, Industrial
City, Jeddah, Saudi Arabia
Client: AGM Factory
Participation: Structural design of Additional Room Inside Factory.
·
January to November 1994 - SORAYAI CARPET
FACTORY - HARAJ, Jeddah, Saudi Arabia
Client: Sheik Sorayai
Participation: Structural design, preparation of fabrication
drawings, order of materials and overall coordination for the construction of 1 Warehouse with Mezzanine Floor (44mx72mx9m
high) and 1 Two-Storey Showroom (20mx30mx8m high).
·
February 1994 - SAUDI MODERN FOOD FACTORY,
Industrial City, Jeddah, Saudi Arabia
Client: Saudi Modern Food Factory
Participation: Structural design, preparation
of fabrication drawings, order of materials and overall coordination for Two-Level Maintenance Platform.
·
January to December 1994 - JEDDAH TOURISTIC
CITY, Dahban, Saudi Arabia
Client: SAMACO
Participation: Structural design of Precast Retaining Walls, Diaphragm Walls
and Stone Screen Structure.
·
July 1994 - GSM OVERLAY NETWORK, Jeddah,
Saudi Arabia
Client: Siemens
Participation: Structural design of various steel substructures for antennae.
·
August 1994 - YANBU CEMENT FACTORY,
Yanbu, Saudi Arabia
Client: KHD - Yanbu Cement Factory
Participation: Structural design and coordination for the order,
fabrication and delivery of materials for cantilever carport and butterfly carport.
·
September 1994 - PRIVATE MARINA, North
Obhur, Jeddah, Saudi Arabia
Client: Sheik Fahad Zahid
Participation: Structural design of precast concrete pedestals
and footings to support a wooden jetty and gazebo, and precast blocks and slabs to form a slipway.
·
October to November 1994 - REFRIGERATED
PLANT, WAREHOUSE, OFFICE & ACCOMODATION BLDG, Halaga, Jeddah, Saudi Arabia
Client: Al-Ghamdi
Participation: Structural
design of foundation and structures.
·
November 1994 - TWO-STOREY WORKERS'
ACCOMODATION, Haraj, Jeddah, Saudi Arabia
Client: Sheik Sorayai
Participation: Structural design.
·
May to June 1995 - AL-KAMAL OFFICE BUILDING,
Jeddah, Saudi Arabia
Client: Al-Kamal Import Office Co. Ltd.
Participation: Structural design of foundation for tower
crane, and modification of structural systems like floor and precast concrete cladding.
·
July 1995 - THAI HOUSE, North Obhur,
Jeddah, Saudi Arabia
Client: Zeem Corporation
Participation: Structural design of structural supports - precast concrete
footings and columns on asbestos pipes.
·
July 1995 to June 1996 - ALIREZA PRIVATE
VILLA, Jeddah, Saudi Arabia
Client: Sheik Nabil Alireza
Participation: Structural design of Main Villa (A=2000 sqm)
and Underground Tanks.
·
August 1995 - ZAHID BEACH HOUSE, North
Obhur, Jeddah, Saudi Arabia
Client: Sheik Fahad Zahid
Participation: Structural design of Jetty and Gazebo.
·
August 1995 to January 1998- SAUDI GLASS
FACTORY, Industrial City, Jeddah, Saudi Arabia
Client: Saudi Glass Co.
Participation: Design of structures including
Switchgear Room supported by one row of columns, cantilever floor beams and strip footings, Watchman Tower, Retaining Wall
for wet sand, Machine Platforms, Factory Extension and miscellaneous structures.
·
October 1995 - JAMJOOM COMMERCIAL CENTER,
Jeddah, Saudi Arabia
Client: Jamjoom Co.
Participation: Structural design of exhaust ducts for main generator (22m horizontal
and 50m vertical), foundation slabs, cable trenches, steel frames, catwalks, stairs and other miscellaneous structures.
·
December 1995 to August 1997 - SUGAR
REFINERY PROJECT, Jeddah, Saudi Arabia
Client: TPL Arabia Ltd.
Participation: Overall Project Engineer. Detailed design
and supervision for the preparation of shop drawings, submittals, fabrication, erection and site works for steel conveyors, towers, supports, bridges, pipe racks, shelters, handrails, ladders, stairs, gratings,
catwalks and other miscellaneous structures.
·
March 1996 - AL-OTHMAN MARINA WORKS,
Jeddah, Saudi Arabia
Client: Sheik Al-Othman
Participation: Structural design of precast retaining walls to form an
octagonal-shape sitting area and slipway.
·
August 1996 - OLD AGM OFFICE EXTENSION
BUILDING, Jeddah, Saudi Arabia
Client: Arabian Gulf Manufacturing Co.
Participation: Structural design.
·
October 1996 to September 1997 - NEW
BOAT DOCK, North Obhur, Jeddah, Saudi Arabia
Client: Zeem Corporation
Participation: Structural design of New Dockwall
2m wide x 100m long x 7.6m deep, Seawater Pumphouse, Mezzanine Floor at Quarantine Building and Gazebo.
·
November 1996 - AL-TAYAR PLASTIC FACTORY,
Industrial City, Jeddah, Saudi Arabia
Client: Al-Tayar Plastic Manufacturing Co.
Participation: Structural design of
Cantilever Parking Shed.
·
March 1997 - THREE-STOREY COMML/RESL
BUILDING, Maypajo, Caloocan City, Phils.
Client: Arch. Alfredo N. Torres
Participation: Complete structural design.
·
April 1997 - RESIDENCE OF MR. INIGO
ZOBEL, Makati City, Phils.
Client: Engr. Rogel Majiya
Participation: Complete structural design.
·
April 1997 - FARROWING HOUSE, Sta. Maria,
Bulacan, Philippines
Client: Mr. Lorenzo Ong
Participation: Complete structural design.
·
May 1997 - TWO-STOREY RESIDENCE, Neopolitan,
Fairview, Quezon City, Philippines
Client: Engr. Ferdinand T. Uguil
Participation: Complete structural design and estimate.
·
May 1997 - BUILDING FOR RICABEL HOME
IND., Manila, Philippines
Client: Arch. Alfredo N. Torres
Participation: Complete structural design.
·
May 1997 - TWO-STOREY RESIDENCE, Talon,
Las Pinas, Philippines
Client: Engr. Jose Nadal Jr.
Participation: Complete structural design, drafting and estimate.
·
May 1997 - WAREHOUSE, Laguna, Philippines
Client:
Engr. Rogel Majiya
Participation: Structural design.
·
June 1997 - MARINA WORKS, Jeddah, Saudi
Arabia
Client: Sheik Zyad Qerbawi
Participation: Structural design of Jetty and Gazebo.
·
July to August 1997 - VILLA EXTENSION
AND MODIFICATION, Jeddah, Saudi Arabia
Client: Sheik Zeid Sudeiry
Participation: Extension and Structural Modification
involving removal of existing columns, replacement of new one to support existing floor loads and additional roof loads.
·
September 1997 - MARINA WORKS, Manama, Bahrain
Client: Fast Flow Services
Participation: Structural design of slipway, pontoons and steel piles.
·
September 1997 - STEEL VEHICLE RAMP,
AAA, Jeddah, Saudi Arabia
Client: Arabian Auto Agency
Participation: Structural design of steel modular ramp, 17m long
x 6m wide and 1.8m high.
·
September to November 1997 - AL-BAHA
EXCHANGE EXTENSION, Al-Baha, Saudi Arabia
Client: Saudi Wiemer & Trachte Ltd.
Participation: Design, preparation
of fabrication drawings and overall coordination for the order, fabrication and delivery of steel materials.
·
October 1997 - ATTIEH STEEL FACTORY,
Bahrah, Saudi Arabia
Client: Arabian International Co.
Participation: Design of various machine foundations and underground
tanks.
·
November 1997 - BOUNDARY WALL, North
Obhur, Jeddah, Saudi Arabia
Client: Al-Angari
Participation: Design of 4.5m high boundary wall extending 70m towards
the reef line. System is composed of precast footings, columns and walls.
·
November 1997 - LOADING DOCK FOR CARPET
FACTORY, Industrial City, Jeddah, Saudi Arabia
Client: Sorayai Carpet Factory
Participation: Design of loading dock
between Plants 1 & 3. Precast cantilever walls were used to avoid interference with the plant operation.
·
November to December 1997 - MARINA WORKS,
Jeddah, Saudi Arabia
Client: Durrah Marina
Participation: Design of aluminum jet ski ramp and steel pontoon system composed
of 2-dia.750 pipes, 11m long each, connected with each other by rectangular pipes.
·
December 1997 - FILM BLOWING LINE TOWER,
Industrial City, Jeddah, Saudi Arabia
Client: Al-Tayar Plastic & Rubber Factory
Participation: Design, fabrication
and erection.
·
December 1997 - ALIREZA JETTY, North
Obhur, Jeddah, Saudi Arabia
Client: Sheik Alireza
Participation: Design of wooden jetty supported by precast beam-column-footing
spaced at 6m on center.
·
January to March 1998 - SAUDI MODERN
FOOD FACTORY, Industrial City, Jeddah, KSA
Client: Basamah Trading
Participation: Design of maintenance platform at
Boiler Room, platform for pump and gas tanks, cantilever maintenance platform at silo area and chimney pipes.
·
January to July 1998 - CARPET FACTORY
PLANT 2 EXTENSION, Industrial City, Jeddah, KSA
Client: Sheik Sorayai
Participation: Design of foundation and structure
for 8 silos, and machine platform structure, 60 tons total weight.
·
February to July 1998 - MAHMOUD SAEED
PLAZA, Sitten - Waly Al Ahd Sts., Jeddah, KSA
Client: Oasis Production Co. & Saudi Architect
Participation: Design
of waterfall structure at main attraction area, two waterfall structures at front elevation of building, structural supports
for two escalators, main pool deck handrails and pilasters, handrails for arch bridges and mezzanine floor.
·
May 1998 - TARUT EXCHANGE EXTENSION,
Dammam, Saudi Arabia
Client: Saudi Wiemer & Trachte Ltd.
Participation: Design, preparation of fabrication drawings
and overall coordination for the fabrication and delivery of steel materials.
·
June 1998 - AZZAM FABRICATION WORKSHOP,
Jeddah, Saudi Arabia
Client: Azzam Co.
Participation: Design of Fabrication Workshop Shed, 36m x 29m x 11.5m high.
·
June 1998 to June 2000 - YANPET EXPANSION
PROJECT, Yanbu, Saudi Arabia
Client: AMC Industrial Construction - Mitsubishi Heavy Industries
Participation: Detailed
design, overall coordination for preparation of shop drawings, fabrication and delivery to Yanbu site, of structural steel
composed of various platforms, pipe supports, davit supports, handrails, ladders, gratings, checkered plates, fencing materials
for substations and other steel structures.
·
June to July 1998 - YACHT HARBOUR NEW
LAND, North Obhur, Jeddah, Saudi Arabia
Client: Zeem Corporation
Participation: Design of 4m & 6m high dockwalls
and gazebo; Precast hollow blocks 2mx1mx1m & 2mx1.4mx1m high are stacked over each other to obtain the required dock height.
Total length of dockwall is 115m.
·
June to July 1998 - AL-SALAMA HOSPITAL,
Jeddah, Saudi Arabia
Client: Saudi Bauer
Participation: Order of materials, fabrication and delivery of reinforcement
for concrete piles of various sizes - dia.450x8m to 12m.
·
July 1998 - AL-TAYAR PLASTIC & RUBBER
FACTORY, Jeddah, Saudi Arabia
Client: Gulf Co. for Packaging Systems
Participation: Design of Building Shed for silos
4.5m wide x 45m long x 8.7m high.
·
July to December 1998 - ATTIEH STEEL
FACTORY, Jeddah, Saudi Arabia
Client: Arabian International Co.
Participation: Design of shearing machine foundation,
chimney foundation and septic tanks.
·
August 1998 - S/S ISKAN AL AAM SUBSTATION,
Madinah, Saudi Arabia
Client: Al Aam Substation
Participation: Design of boundary wall using precast footings, columns
and wall panels. Height= 3m, Total length= 192m.
·
October 1998 - RABIGH EXCHANGE EXTENSION,
Rabigh, Saudi Arabia
Client: Saudi Wiemer & Trachte Ltd.
Participation: Design, preparation of fabrication drawings
and overall coordination for the fabrication and delivery of steel materials.
·
October to December 1998 - CARPET FACTORY
PLANT 1, Industrial City, Jeddah, Saudi Arabia
Client: Sheik Sorayai
Participation: Design of heavy steel frame to replace
existing columns interfering with new equipment layout.
·
December 1998 - SUDEIRY BEACH HOUSE,
North Obhur, Jeddah, Saudi Arabia
Client: Sheik Zeid Sudeiry
Participation: Design of boundary wall at sea south side
using precast walls and columns, and cast-in-place footings.
·
April 1999 to July 2000 - 380KV GIS
BLDG EXT AND CABLE ROUTE TO CONTROL ROOM, Yanbu, Saudi Arabia
Client: Mitsubishi Corporation
Participation: Design of
cable route from 380KV GIS Building to Control Room composed of the following structures: two(2) cable bridges 28m span, 2m
wide, 2.6m deep, and 19m span, 2.5m wide, 2.6m deep; reinforced duct banks 300m long; various manholes; cable trays; transformer
building; septic tanks, catwalks, stairs, handrails, ladders and platforms.
·
May to July 1999 - ARAFAT SUBSTATION
EXTENSION, Makkah, Saudi Arabia
Client: National Telecommunications
Participation: Design of steel building and boundary
wall 2.8m high, 100m long, all precast.
·
September 1999 - YANBU CEMENT FACTORY,
Yanbu, Saudi Arabia
Client: KHD-Yanbu Cement Factory
Participation: Detailed design of Tripper Car Docking Tower, 4.2m
x 6m x 17m high.
·
November 1999 - MINA DEVELOPMENT PROJECT,
Mina, Saudi Arabia
Client: Al-Owaidah Contracting Co.
Participation: Design of substation boundary wall, 480m long x
2.6m high, all precast.
·
November 1999 to August 2000- SUDEIRY
BEACH HOUSE, North Obhur, Jeddah, KSA
Client: Sheik Zeid Sudeiry
Participation: Design of warehouse and workshop, boundary
wall, precast walkway, and precast blocks for artificial island.
·
December 1999 to May 2001- SAUDI MODERN
FOOD FACTORY, Industrial City, Jeddah, KSA
Client: Basamah Trading
Participation: Design of foundation for 5000sqm factory,
two-storey 450sqm office building, 576sqm mezzanine floor, pump rooms for firefighting and potable water, and underground
tanks for firefighting water, potable water, untreated raw water, treated raw water and returned water.
·
March 2000- SHOHAIBAH POWER PLANT, Shohaibah,
Saudi Arabia
Client: Shohaibah Power Plant
Participation: Design of generator house and sewage treatment plant.
·
May 2000 - AGM PLASTIC FACTORY, Industrial
City, Jeddah, KSA
Client: AGM
Participation: Design of 540sqm additional office area over an existing roof. New columns
and beams are provided to carry the loads.
·
June to July 2000 - CARPET FACTORY PLANT
1, Industrial City, Jeddah, Saudi Arabia
Client: Sheik Sorayai
Participation: Design of 3 heavy steel frames to replace
18 existing columns interfering with new equipment layout. These frames support 9 rafters spanning 45m. Affected area is 45m
x 65m.
·
July 2000 - MEDICAL PVC FACTORY, Industrial
City, Jeddah, Saudi Arabia
Client: TIB Plastic Industries
Participation: Detailed design of V-shaped car shed, 6m wide
x 40m long, with 180x8 sq.tube rafter and 5"sch.40 pipe supports.
·
August 2000 - CARPET FACTORY PLANT 1,
Industrial City, Jeddah, Saudi Arabia
Client: Sh. Sorayai
Participation: Detailed design of Mezzanine Floor, 44m x 22.5m
x 3.8m high.
·
September 2000 - MINA DEVELOPMENT PROJECT,
Mina, Saudi Arabia
Client: Al-Owaidah Contracting Co.
Participation: Design of all-precast boundary wall 4m high x 3000m
long.
·
September 2000 - SHOHAIBAH POWER PLANT,
Shohaibah, Saudi Arabia
Client: Hitachi Ltd.
Participation: Design of miscellaneous steel supports.
·
October 2000 - SAUDI CRYSTAL BUILDING,
Yanbu, Saudi Arabia
Client: Saudi Crystal
Participation: Design of four-storey steel building
·
October 2000 - AAA BUILDING EXTENSION,
Jeddah, Saudi Arabia
Client: Arabian Auto Agency
Participation: Design of foundation for building extension 2500sqm
area.
·
November 2000 - LIGHT VEHICLES WORKSHOP,
Jeddah, Saudi Arabia
Client: Azzam Trading
Participation: Design of additional workshop and parking shed for light vehicles,
468sqm area.
·
December 2000 - WORKSHOP MODIFICATION,
Jeddah, Saudi Arabia
Client: Azzam Trading
Participation: Modification of workshop for 70-ton yacht by raising the existing
roof from a height of 7.37m to 10.37m. Affected area is 15.9m x 37.35m or 594sqm.
·
January 2001 - AL-JAMIA SUBSTATION,
Jeddah, Saudi Arabia
Client: Hitachi Ltd.
Participation: Design of steel structures to support lightning arresters,
line traps, station post insulators and coupling capacitors.
·
January 2001 - BEACH HOUSE COTTAGE,
North Obhur, Jeddah, Saudi Arabia
Client: Zeem Corporation
Participation: Design of concrete support structures for
wooden beach house cottage and walkways.
·
January 2001 - SUDEIRY BEACH HOUSE,
North Obhur, Jeddah, Saudi Arabia
Client: Sheik Sudeiry
Participation: Design of squash court building, and renovation
works for existing shed and guest room.
·
February to October 2001 - ENTERPRISE
PROJECT - MPC/88, Jeddah, Saudi Arabia
Client: Modern Products Co.
Participation: Detailed engineering for the fabrication
and erection of structural steel for engineering workshop, production building, facility building, warehouse link building,
production link building and parking shed.
·
March 2001 - AL-MOEYAH SUBSTATION, Moeyah,
Saudi Arabia
Client: Saudi Electric Co.
Participation: Design of boundary wall 2.6m high x 400m long, all precast.
·
April 2001 - RESIDENTIAL BUILDING, Meycauayan,
Bulacan, Philippines
Client: Mr. & Mrs. James Madriaga
Participation: Design of Three-Storey Residential Building.
·
April 2001 - AAA BEACH HOUSE, North
Obhur, Jeddah, Saudi Arabia
Client: Zeem Corporation
Participation: Design of column and foundation for Thai Hut Lounge.
·
April 2001 - MATTEX FACTORY, Industrial
City, Jeddah, Saudi Arabia
Client: Saudi Co. for Carpet Materials
Participation: Design of steel pipe supports, stairs,
loading platform and septic tank.
·
May 2001 - GULF STATIONERY FOR FILE
MFG., Industrial City, Jeddah, Saudi Arabia
Client: Gulf Packaging System Co.
Participation: Design of factory 80m x
39m.
·
June 2001 - YANBU CEMENT FACTORY, Yanbu,
Saudi Arabia
Client: KHD
Participation: Design of steel pipe supports including foundation.
·
July 2001 - AAA BEACH HOUSE, North Obhur,
Jeddah, Saudi Arabia
Client: Zeem Corporation
Participation: Design of Marina Building Extension.
·
September to October 2001 - CRISTAL
PIGMENT PLANT, Yanbu, Saudi Arabia
Client: Cristal Co. Ltd.
Participation: Detailed engineering and fabrication of Pressure
Filter Building.
·
October 2001 - CORNICHE APARTMENTS, Jeddah, Saudi Arabia
Client: Issham International
Participation: Structural calculations for 4-storey building with
basement.
·
January to April 2002 - RBNC BUILDING
RENOVATION, Quezon City, Philippines
Client: RBNC Trading
Participation: Design, engineering and supervision for the
renovation and construction of additional floor.
·
April to July 2002 - SUDEIRY BEACH HOUSE,
North Obhur, Jeddah, Saudi Arabia
Client: Sheik Zeid Sudeiry
Participation: Design of precast support for gazebo, pump
room, tank farm and dolphin sculpture.
·
May 2002 - ARABIAN CEMENT FACTORY, Rabigh,
Saudi Arabia
Client: Arabian Cement Co.
Participation: Design of Roller Support for 65-ton gearbox.
·
May 2002 - BULGHAH GOLD MINE PROJECT,
Bulghah, Saudi Arabia
Client: GCC Olayan
Participation: Design of Transformer Foundation.
·
June 2002 to January 21, 2003 -
EL-KHAYYAT RED BRICKS FACTORY, Bahrah, Saudi Arabia
Client: El-Khayyat Red Bricks Mfg. Co.
Participation: Design and
engineering for the fabrication of structural steel for sheds, supports, platforms, ducts, thermal rooms and other structures.
·
June 2002 to March 2003 -
SAUDI CARTON FACTORY/ UNITED CARTON IND. CO., Jeddah, Saudi Arabia
Client: Omar Kaseem Alesayi Marketing Co.
Participation:
Design and engineering for the fabrication of structural steel for bridge connecting two buildings, 40m high advertisement
tower, steel platforms and other structures.
·
June 2002 - STEEL BRIDGE, Muscat, Sultanate
of Oman
Client: Omar Zawawi Establishment
Participation: Design of steel truss bridge for 40-ton truck load. Bridge
dimensions: 4.25m wide x 4.5m high x 27m long.
·
July to September 2002 - BULGHAH GOLD
MINE PROJECT, Bulghah, Saudi Arabia
Client: Hatch Co. Ltd.
Participation: Design of Air Compressor Shed, Steel Enclosures,
Electrowinning Cell Support Platform, Carbon Sieve Screen Support, Swivel Pipe Support and various stairs.
·
October 2002 to November 2003 - RED
BRICKS FACTORY NO.10, Jizan, Saudi Arabia
Client: El-Khayyat Red Bricks Mfg. Co.
Participation: Design and engineering
for the fabrication of Factory Shed 233m x 38m x 12m high and numerous platforms; Preparation of bar bending schedule
and order of materials for foundation works.
·
December 2002 to September 2003 - 110/33/13.8KV
UMLUJJ SUB-STATION, Umlujj, Saudi Arabia
Client: ABB Contracting Co.
Participation: Preparation of bar bending schedules
and order of materials for buildings, ducts and other civil structures.
·
January 2003 to April 2003 - 110/13.8KV
YANBU NORTH SUBSTATION, Yanbu, Saudi Arabia
Client: ABB Contracting Co.
Participation: Design of precast boundary wall
2.8m high x 160m long; Preparation of bar bending schedules and order of materials for buildings, ducts and other civil structures.
·
March 2003 to June 2003 - AL-ULA SUBSTATION,
Al-Ula, Saudi Arabia
Client: ABB Contracting Co.
Participation: Design of precast boundary wall 2.55m high x 460m long;
Preparation of bar bending schedules and order of materials for buildings, ducts, underground water tanks, oil separation
tanks, transformer foundations, gantry foundations, pump room, control room and other civil structures.
·
May 2003 to December 2003 - ENTERPRISE
PROJECT - MPC/88, Jeddah, Saudi Arabia
Client: Modern Products Co. (Procter & Gamble)
Participation: Detailed engineering
for Workshop & Training Center
·
June 2003 to September 2003 - TAIMA
SUBSTATION, Taima, Saudi Arabia
Client: ABB Contracting Co.
Participation: Preparation of bar bending schedules
and order of materials for buildings, ducts, underground water tanks, oil separation tanks, transformer foundations, gantry
foundations, pump room, control room and other civil structures.
·
July 24, 2003 - BUOY FOR ANCHOR BLOCK
SETTING
Client: Azzam Marina Division
Participation: Design and coordination for the construction of 4mx3.5mx1.2m high
Buoy for anchor block setting, consists of steel frames and styrofoam and marine plywood decking. (Opening at center = 1.5mx2m)
· October 2003 to November 2003 - ARABIAN CEMENT FACTORY, Rabigh, Saudi Arabia
Client:
KHD Humboldt Wedag AG
Participation: Site supervision for Silo Roof Reconstruction and Strengthening Works at Clinker Silo
5, Cement Silos 6, 7 & 8 and Raw Mill Silos 7 & 8.
·
October 2003 to December 2003 - SORAYAI
CARPET FACTORY PLANT 1, Jeddah, Saudi Arabia
Client: Sheik Sorayai
Participation: Roof structure modification replacing
four (4) steel columns.
·
October 2003 to September 2004 - CORAL REEF ENCOUNTER, North Obhur, Jeddah, Saudi Arabia
Client: Issham International Co.
Participation: Design of all structures for jetties,
walkways, gazebos, retaining walls, floating gardens, underwater viewing chamber and other structures. Footings, columns and
deck formworks are all precast. Deck slabs are cast-in-place.
·
November 2003 to December 2003 - 110/33KV
SHOAIBAH SUBSTATION EXTENSION, Shoaibah, Saudi Arabia
Client: National Telecommunications Co. Ltd.
Participation: Design
of Switchgear Building, Transformer Foundations & Oil Separation Tanks.
·
February 2004 - NATEL OFFICE & WAREHOUSE
EXTENSION, Jeddah, Saudi Arabia
Client: National Telecommunications Co. Ltd.
Participation: Design of structural steel
and foundation for Office and Warehouse Extension.
·
February 2004 to April 2004 - NFIC EXTENSION
WORKS, Jeddah, Saudi Arabia
Client: National Food Industries Co.
Participation: Design and engineering works for new
hangar 30m x 7m, order of materials, preparation of bar bending schedule and site coordination.
·
April 2004 to August 2004 - MEDINA SOUTH
& AIRPORT ROAD SUBSTATION EXTENSION, Medina, Saudi Arabia
Client: National Electric Engineering Co. (Hitachi)
Participation:
Design and engineering for 40MVA Transformer Foundation, Duct Banks, Control Room and Oil Pit.
·
April 2004 to August 2004 - SHANABRAH
& GARWA SUBSTATION EXTENSION, Taif, Saudi Arabia
Client: National Electric Engineering Co. (Hitachi)
Participation:
Design and engineering for 40MVA Transformer Foundation, Oil Separation Tank and miscellaneous steel works.
·
May 2004 to September 2004 - AL HAKEEM
GIRLS' SCHOOL EXTENSION, Jeddah, Saudi Arabia
Client: Dar Al Zikr / Syed Masood Ahmed Est.
Participation: Design of
steel structures and foundation for the addition of one storey above existing building, preparation of engineering and shop
drawings, bar bending schedules, order of materials, fabrication coordination and supervision.
·
December 2004 to December 2005 - EXTENSION
OF SHOAIBAH 380KV SUBSTATION, Shoaibah, Saudi Arabia
Client: Nichimen Corporation
Participation: Preparation of all
shop drawings for 380KV GIS Building, Control Building, Cable Rack Bridge, Equipment Foundations, Siporex Materials and
Interface Modification Works; Quantity take off and order of all structural steel materials for GIS Building, Control Building,
Cable Rack Bridge and various embedded items like protection angles, anchor bolts and base channels for GIB support
foundation, shunt reactor foundation, LA foundation, DS foundation etc.; and Preparation of bar bending schedules
and order of reinforcement for all concrete works including foundation, retaining wall, tunnels, slabs and oil separation
tank.
·
January 2005 to June 2005 - YANBU CEMENT
FACTORY EXTENSION (KILN FEED NO.3), Yanbu, Saudi Arabia
Client: BHA GROUP GmbH
Participation: Design of foundation for
Stair Tower and Silo Structure, Bag Filter Structure, Cable Bridges, Substation Building, Fan Motor & Duct Supports; Design
of steel structures for Cable Bridges and Supports; and Preparation of Quantity Take-off and Order of steel materials for
the fabrication of Stair Tower, Bag Filter Structure, Cable Bridges, Substation Building and Duct Supports.
·
May 2005 to November 2005 - MPC PAMPERS
FACTORY LINE 15 EXTENSION WORKS, Jeddah, Saudi Arabia
Client: Modern Products Co. (Procter & Gamble)
Participation:
Preparation of all shop drawings for FAS Building & Production Building including PAROC wall, conveyor platforms,
pipe racks, jib cranes, catwalks, process pipe supports, ladders, bollards and other steel fabrication works; Design for the
strengthening and modification of existing structure to accomodate new line 16 structures; and Quantity take off and order
of materials.
·
February 2006 to September 2006 - NON-WOVEN
FACTORY, Jubail, Saudi Arabia
Client: MADA
Participation: Checking of design drawings and preparation of all shop drawings
for issuance to site; Preparation of bar bending schedules and order of reinforcement for foundation works, retaining walls,
silo foundation, concrete columns, suspended slabs and beams, stairs, ramps and equipment foundations; Preparation of fabrication
drawings of all embedded items like anchor bolts, protection angles, base channels, gratings, manhole covers etc.
- April 2006 to
March 2007- KHAYYAT NEW JEDDAH RED BRICKS FACTORY, Khulais, Saudi Arabia
Client: El Khayyat Red Bricks Co.
Participation:
Design of various foundations for Crusher Plant including Sieve Structure, Load Hopper Structure, Stair Tower and
other steel structures; Preparation of shop drawings for above-described structures, platforms and ducting works; Preparation
of material lists & quantity take-offs for ordering of raw materials & invoicing purposes; Preparation of bar bending
schedules and order of steel reinforcement.
- August 2006 to March
2007 - YANBU CEMENT FACTORY EXTENSION KILN 1 & 2, Yanbu, Saudi
Arabia
Client: Yanbu Cement Factory / BHA Group GmbH
Participation: Design of foundation for silo and stair tower structure,
bag filter structure, cable bridges, substation building, fan motor and ducts supports; Design of steel structures for cable
bridges and supports; Design of substation building; Supervision of draftsmen in preparing shop drawings; Preparation of quantity
take-off and order of steel materials for the fabrication; Preparation of bar bending schedules & order of reinforcement.
- November 2006 to September
2007 - 48m x 330m FACTORY FOR GULF PACKAGING INDUSTRIES LTD., Jubail, Saudi Arabia
Client: MADA Company for Industrial
and Commercial Investment
Consultant: Saudi Consulting and Design Office
Participation: Preparation of reinforcement
drawings and bar bending schedules for 900 tons of steel reinforcement for various foundation works - footings, pedestals,
ground beams, columns, beams, slabs & machine foundations.
- November 2006 to September
2007 - RABIGH REFINING & PETROCHEMICAL COMPANY, Rabigh, Saudi Arabia
Client: Sojitz Corp. (Japan AE Power Systems Corp.)
Consultant:
Foster Wheeler Energy Limited
Participation: Design of steel structures for substations SS-30, SS-40, SS-44, SS-45, SS-46,
SS-49, SS-60 & SS-63; Supervision of draftsmen in preparing all shop drawings; Quantity take-off and order of steel materials;
Preparation of bar bending schedules & order of reinforcements; Organize quality control inspection & testing with
third party independent testing laboratory; Submittal of QC/QA documents for approval of consultant; Preparation of various
engineering reports
- November 2007 - SILA FISHING HARBOUR - Abu Dhabi,
United Arab Emirates
Client: Mr. Eric Hersperger
Participation: Design of anchorage for SF Marina Concrete Pontoons
Type 1040-20, used as berthing facilities for fishing vessels. Design vessel length = 18m; Anchor block used = trapezoidal,
precast; Anchor chain = stud link, diameter 24mm; Bank seat = precast concrete