  • November 2007 - SILA FISHING HARBOUR - Abu Dhabi, United Arab Emirates
    Client: Mr. Eric Hersperger
    Participation: Design of anchorage for SF Marina Concrete Pontoons Type 1040-20, used as berthing facilities for fishing vessels. Design vessel length = 18m; Anchor block used = trapezoidal, precast; Anchor chain = stud link, diameter 24mm; Bank seat = precast concrete
  • October 2003 to September 2004 - CORAL REEF ENCOUNTER, North Obhur, Jeddah, Saudi Arabia
    Client: Issham International Co.
    Participation: Design of all structures for jetties, walkways, gazebos, retaining walls, floating gardens, underwater viewing chamber and other structures. Footings, columns and deck formworks are all precast. Deck slabs are cast-in-place.
  • July 24, 2003 - BUOY FOR ANCHOR BLOCK SETTING
    Client: Azzam Marina Division
    Participation: Design and coordination for the construction of 4mx3.5mx1.2m high Buoy for anchor block setting, consists of steel frames and styrofoam and marine plywood decking. (Opening at center = 1.5mx2m)
  • June 2002 - STEEL BRIDGE, Muscat, Sultanate of Oman
    Client: Omar Zawawi Establishment
    Participation: Design of steel truss bridge for 40-ton truck load. Bridge dimensions: 4.25m wide x 4.5m high x 27m long.

  • April to July 2002 - SUDEIRY BEACH HOUSE, North Obhur, Jeddah, Saudi Arabia
    Client: Sheik Zeid Sudeiry
    Participation: Design of precast support for gazebo, pump room, tank farm and dolphin sculpture.
  •  April 2001 - AAA BEACH HOUSE, North Obhur, Jeddah, Saudi Arabia
    Client: Zeem Corporation
    Participation: Design of precast column and foundation for Thai Hut Lounge.
  • January 2001 - BEACH HOUSE COTTAGE, North Obhur, Jeddah, Saudi Arabia
    Client: Zeem Corporation
    Participation: Design of concrete support structures for wooden beach house cottage and walkways.
  • January 2001 - SUDEIRY BEACH HOUSE, North Obhur, Jeddah, Saudi Arabia
    Client: Sheik Sudeiry
    Participation: Design of squash court building, and renovation works for existing shed and guest room.
  • November 1999 to August 2000- SUDEIRY BEACH HOUSE, North Obhur, Jeddah, KSA
    Client: Sheik Zeid Sudeiry
    Participation: Design of warehouse and workshop, boundary wall, precast walkway, and precast blocks for artificial island.
  • December 1998 - SUDEIRY BEACH HOUSE, North Obhur, Jeddah, Saudi Arabia
    Client: Sheik Zeid Sudeiry
    Participation: Design of boundary wall at sea south side using precast walls and columns, and cast-in-place footings.
  • June to July 1998 - YACHT HARBOUR NEW LAND, North Obhur, Jeddah, Saudi Arabia
    Client: Zeem Corporation
    Participation: Design of 4m & 6m high dockwalls and gazebo; Precast hollow blocks 2mx1mx1m & 2mx1.4mx1m high are stacked over each other to obtain the required dock height. Total length of dockwall is 115m.
  • December 1997 - ALIREZA JETTY, North Obhur, Jeddah, Saudi Arabia
    Client: Sheik Alireza
    Participation: Design of wooden jetty supported by precast beam-column-footing spaced at 6m on center.
  • November to December 1997 - MARINA WORKS, Jeddah, Saudi Arabia
    Client: Durrah Marina
    Participation: Design of aluminum jet ski ramp and steel pontoon system composed of 2-dia.750 pipes, 11m long each, connected with each other by rectangular pipes.
  • November 1997 - BOUNDARY WALL, North Obhur, Jeddah, Saudi Arabia
    Client: Al-Angari
    Participation: Design of 4.5m high boundary wall extending 70m towards the reef line. System is composed of precast footings, columns and walls.
  • September 1997 - MARINA WORKS, Manama, Bahrain
    Client: Fast Flow Services
    Participation: Structural design of slipway, pontoons and steel piles.
  • June 1997 - MARINA WORKS, Jeddah, Saudi Arabia
    Client: Sheik Zyad Qerbawi
    Participation: Structural design of precast jetty and gazebo.
  • October 1996 to September 1997 - NEW BOAT DOCK, North Obhur, Jeddah, Saudi Arabia
    Client: Zeem Corporation
    Participation: Structural design of New Dockwall 2m wide x 100m long x 7.6m deep, Seawater Pumphouse, Mezzanine Floor at Quarantine Building and Gazebo.
  • March 1996 - AL-OTHMAN MARINA WORKS, Jeddah, Saudi Arabia
    Client: Sheik Al-Othman
    Participation: Structural design of precast retaining walls to form an octagonal-shape sitting area and slipway.
  • August 1995 - ZAHID BEACH HOUSE, North Obhur, Jeddah, Saudi Arabia
    Client: Sheik Fahad Zahid
    Participation: Structural design of precast jetty and gazebo.
     
  • July 1995 - THAI HOUSE, North Obhur, Jeddah, Saudi Arabia
    Client: Zeem Corporation
    Participation: Structural design of structural supports - precast concrete footings and columns on asbestos pipes.
     
  •  September 1994 - PRIVATE MARINA, North Obhur, Jeddah, Saudi Arabia
    Client: Sheik Fahad Zahid
    Participation: Structural design of precast concrete pedestals and footings to support a wooden jetty and gazebo, and precast blocks and slabs to form a slipway.

  •  January to December 1994 - JEDDAH TOURISTIC CITY, Dahban, Saudi Arabia
    Client: SAMACO
    Participation: Structural design of Precast Retaining Walls, Diaphragm Walls and Stone Screen Structure.
     
  • August to September 1993 - MARINA EXTENSION, North Obhur, Jeddah, Saudi Arabia
    Client: Zeem Corporation
    Participation: Structural design of dockwall 2m wide x 80m long. Type: Precast concrete hollow blocks 2mx1mx1mhigh stacked over each other in staggered position resting over precast concrete bases.

  • June 1993 - STEEL CRADLE FOR 70-TON YACHT, Jeddah, Saudi Arabia
    Client: Sheik Zeid Sudeiry
    Participation: Structural design, drafting and detailing.